T2K run extension being studied

April 14, 2016

The T2K collaboration is considering the improvements in physics sensitivity, especially for CP violation, from an extension of the running time with beam power of ~1.3 MW. An Expression of Interest for the T2K extension was presented to the J-PARC PAC held  January 13-15, 2016.